jackow@pressmachine-world.com+86-13817590728 WORLD power press machine manufacturer and supplier
Check or maintenance term table for 3 in 1 roller feeder
Check or maintenance term | Item | Contents |
Maintenance term in irregularly scheduled | Equipment cover Touch screen | Clean the equipment cover Clean the touch screer |
Daily check and Maintenance tem | Decoiler's loop control function; Emergency stop function | Check if loop control sensor work very well; Check if the emergency buttons work very well. |
Weekly check and maintenance term | Drive gears of the straightener feeder part; Material width adjust & guide device at straightener feeder's entrance; Decoiler's Mandrel expansion part. | Check if there is enough grease in movable parts; Fill oil to the gears; Fill grease to decoiler's mandrel expansion parts. |
Monthly check term | Decoiler's chains; Synchronous belt of the straightener feeder Press wheel driving chain of the decoiler ,Bearing's position of the decoiler's main axle Air filter. | Add grease to chains; Check if synchronous belts are in good tension condition Add grease on bearings of the decoiler's main axle; Check if the screws are loose or not. Add lubrication oil in air filter and clear water and impurity in air filter |
Quick Links
Contact Us
• Tel: 86-21-62828320
• Fax: 86-21-62829970
• E-mail: jackow@pressmachine-world.com
• WHATSAPP: +8613817590728
• WEHCHAT: W13817590728
Add
• Exporting Office: 12F, Huaihai Road West, Shanghai, China
• Factory: Picheng World Industrial Park, Danyang City, Jiangsu Province, China