The four-column hydraulic press must be installed and debugged before leaving the factory. The operation and commissioning of the four-column hydraulic press is to make some adjustments to the equipment under normal conditions, so that the equipment can achieve technical performance and meet the production process. The requirements of the equipment. The main contents of the operation and debugging of the four-column hydraulic oil hydraulic system are as follows:
1. Measure the power loss and temperature rise of the four-column hydraulic system. If the loss is large and the temperature rise is high, it will affect the normal operation of the system, and the reason should be analyzed and measures should be taken to solve it.
2. Adjustability of detection force, speed and stroke, and reliability in operation. Problems should be corrected if found.
3. Adjust the motion parameters of each working cycle of the four-column hydraulic system and each action of the cycle, such as force, speed, acceleration, the start and end point of the stroke, the time of each action and the total time of the entire cycle, etc. value, so that the system has the correct and reliable working cycle.
4. The written records of operation and commissioning applications, after approval, are included in the equipment technical files as the original technical basis for equipment maintenance, which plays an important role in diagnosing the causes of hydraulic equipment failures. The above is the whole content of the operation and debugging of the four-column hydraulic press. The official website of WORLD Press Machine is www.pressmachine-world.com. Please indicate the source for reprinting!